Clear Cart
Shopping Cart

No products in the cart.

Phone: 800-414-2358

Fax: 718-946-6727

Phone: 800-414-2358

Fax: 718-946-6727

Free Shipping

Hem & Boo Sports Training Long Lead – Reflective

$ 25.33

Category:
Description Sports Training Long Lead – Hem & Boo Give your recall training a serious upgrade. The Sports Training Long Lead – Reflective is crafted for confident training sessions, active recall practices, and walks with added freedom—without losing control or safety. Build Strength You Can Trust Made from tightly woven nylon, this lead delivers the perfect balance of strength and flexibility. It handles pull and distance work with ease while keeping its sporty look intact. Visibility You Can Rely On With reflective accents, this lead enhances visibility during dawn and dusk training or walks. Stay safe and seen in all conditions. Master Recall, Safely Available in generous lengths—5 m, 10 m, and 15 m—this lead gives you flexible control during recall practice or obedience drills. Training-Ready Design Designed for reactive pups, working breeds, or everyday pets building recall confidence. Pair it with your Sports Harness and Collar for a polished, consistent look. Why Active Owners Choose It Durable nylon for long-lasting use Reflective threading for safety at any hour Length options to suit training styles (5–15 m) Perfect for professional or at–home training routines